Sunday, October 12, 2008

New Stove Installation

The old Squirrel was supervising the Installation

I picked up a new Monitor oil furnace for this back part of the house.  The old squirrel was there to supervise the installation.  At least the beginning installation.   I can't wait until it's in place and working.  Now, we won't have to try to force warm air from the front of the house where the wood stove is located to the rear of the house, where this office located.  As always, I can't ever install anything new with out having to either purchase or borrow a tool I need.   This morning I'm going to have to wait until the hardware store is open to buy a 8 inch bit to drill through the wall where the exhaust and the oil line will go.

3 comments:

  1. Anonymous2:36 AM

    This comment has been removed by the author.

    ReplyDelete
  2. Anonymous2:37 AM

    This comment has been removed by the author.

    ReplyDelete
  3. Anonymous2:38 AM

    We love squirrels and like your blog! Come visit us: http://alaskanshelpinganimals.blogspot.com/

    ReplyDelete